VetroOGK-3 JSC (part of the management circuit of Rosatom Renewable Energy JSC, the management company of the Wind Energy Division of Rosatom State Corporation) has received permission from the administration of the Turkmen Municipal District of the Stavropol Territory to build a Simonovskaya wind farm (WPP) in the district. The approval was preceded by a positive expert opinion on the design documentation and engineering survey results for the construction of the wind farm, which will consist of 20 wind turbines with a capacity of 2.5 MW each (total installed capacity is 50 MW).
Successful completion of the examination confirms that the design documentation for construction sites complies with the results of engineering surveys and the requirements of all technical regulations, including environmental, sanitary and epidemiological requirements, fire safety requirements, regulatory and technical documentation and the Urban Planning Code of the Russian Federation.
Please note that this press release is based on materials provided by the company. AK&M Information Agency shall not be held liable for its contents, nor for the legal and other consequences of its publication.

