Sitronics Electro has completed the installation and connection of a charging hub with a dynamic power distribution system and automated access to electric charging stations in the Ilyinsky Luga residential area from PIK in the Krasnogorsk district of the Moscow Region.
The EHS installed in the Ilyinsky Luga residential complex is public and is accessible not only to residents of more than 9 thousand apartments in the residential complex, but also to all electric motorists. The charging hub is located just 6 minutes away at the Novorizhskoye highway exit towards Moscow. This is especially important for providing the charging infrastructure for electric vehicles in the Moscow Region, given their 58% growth over the past year.
The charging hub includes one fast (DC) and 2 slow (AC) stations with dynamic power balancing and the ability to charge 6 electric vehicles simultaneously. eStation Mini Duo is a self—developed Sitronics Electro - AC alternating current station with a capacity of 44 kW each. They are equipped with GB/T (AC) and Type 2 connectors and allow residents of the quarter to comfortably charge their electric vehicles during their stay at home hours. The 120 kW DC ECU with GB/T (DC) and CCS2 connectors is convenient for electric motorists charging along the way and saving time.
Specifically within the framework of the Sitronics Electro project, automated access to the charging hub was implemented through its mobile application. The installed chain barrier reserves 6 parking spaces next to the charging stations and prevents them from being occupied by vehicles with internal combustion engines.
"For Sitronics Electro, this is the first project implemented for the PIK residential complex. We hope that it can serve as the beginning of strategic cooperation. Together with developers and construction companies, we are creating a comfortable charging infrastructure that is accessible not only to residents of residential complexes, but also to all electric motorists. We are glad that such large developers as the PIK company are thinking about charging infrastructure already at the construction stage. This is an important step in the development of electric transport, and the example of PIK may inspire other developers to integrate charging stations into their projects. The format of a charging hub with automated access, as in Ilyinsky Meadows, has every chance of becoming a new type of solution for modern residential complexes," commented Nikolay Samokhin, Commercial Director of Sitronics Electro.
The charging hub in Ilyinsky Meadows reduces the "gap" on the map of the charging infrastructure of the Moscow region. Until now, the nearest fast charging station on Novorizhskoye Highway in the direction of Moscow was located in the village of Pokrovskoye, the distance between the electric charging station in Pokrovsky and the Ilinsky Luga residential complex is 18.4 km. The new charging point reduces the distance between stations, making driving by electric vehicles even more convenient.
References:
The residential quarter "Ilyinsky Meadows" is located 10 kilometers from the MKAD along Novorizhskoye highway, in the Krasnogorsk city district. 27 residential buildings have already been built on the territory of the complex, and a developed social infrastructure has also been designed.: 9 kindergartens, 4 schools, 2 polyclinics and a hospital.
Sitronics Electro (part of the Sitronics Group) is a Russian operator of charging infrastructure and manufacturer of charging stations for electric vehicles. The operator is building a network of charging stations for electric vehicles across the country, as well as developing an application for drivers and software for managing charging stations.
Please note that this press release is based on materials provided by the company. AK&M Information Agency shall not be held liable for its contents, nor for the legal and other consequences of its publication.