In Bashkortostan, the first span has been concreted on the bridge of the Durtyuli – Achit highway

69
1
AK&M 03 May 2024 19:06

In the Republic of Bashkortostan, concreting of the superstructure began on the main artificial structure of the first stage of the Durtyuli – Achit highway, the bridge over the Belaya River. This was reported on the website of the Cabinet of Ministers with reference to Deputy Prime Minister Marat Khusnullin.

The 140 km long section, which is part of the Durtyuli – Achit highway in the Republic of Bashkortostan, is one of three stages of the large–scale construction of the continuation of the M-12 Vostok highway to Yekaterinburg, M.Khusnullin stressed.

A large artificial structure there will be a bridge with a length of more than 813 m across the Belaya River. Experts, according to him, have started the construction of the superstructure and concreted the first span with a length of 63 m.

In general, work has been deployed on all 56 structures of the first stage, which ends with an interchange on the border of the republic and the Perm Territory.

The total length of the road from the city of Durtyuli to the village of Achit will be 275 km. In addition to the Republic of Bashkortostan, the route will pass through the territories of the Perm Territory and the Sverdlovsk region. It is planned to launch traffic on the M-12 Vostok from the city of Durtyuli to the village of Achit at the end of 2024.